The Gigawatt Age

The Gigawatt Age

Make No Little Plans.

Tuesday September 8th
6:00 PM - 9:00 PM ET · 80 registered

America needs to start building big again.

AI, data centers, advanced manufacturing, defense, and the reindustrialization of the American economy will demand power at a scale we haven't contemplated in decades. We need to think bigger than a megawatt-sized solution. The next era will be measured in gigawatts.

The Nuclear Company is building for that era: starting with nuclear campuses of two to four gigawatts per site, with a pathway to six to eight gigawatts per site. These aren't deployed as one-off projects, they're gigafleets. Making the gigawatt era possible will require an entirely new technology stack built to design, license, construct, and operate nuclear at fleet scale: Nuclear OS.

Join us for an evening inside the Gigawatt Age. Screening Nuclear OS, live demos, and our team on hand to talk about what it takes to build at a scale America hasn't attempted in generations. Music, food, and drinks all night.

Location

909 E St NW

909 E St NW, Washington, DC 20004, USA

The Nuclear Company's DC Hub- Floors 5 and 6

Hyperstition Hyperstition Incorporated
DEEP TECH WEEK · WASHINGTON-2026 / THE GIGAWATT AGE LAST INDEXED · AUG 16, 2026